11 - 20 Feb 2005 - Week of leave for Valentines, so not much done. Today got
the ribs mounted on the spars, matchdrilled, and removed. At first glance, they
did not need fluting, but after a closer look, they do need some light fluting
for a double bow in all of them...
|
|
Flap attach bracket. Hefty buggers. |
|
|
Lotta ribs. Got to thinking about which ones go where and got a headache. |
|
|
Here's the left wing per the plans. |
|
|
Another view |
|
|
|
And the left wing laying down. Of note, when building the left wing, if it calls for a -R ribs for the left wing, it's a -L rib on the right. Think it through carefully and it will make more sense once things are clecoed together. Thanks to the guys on the RV-10 Yahoo group for the sanity check... |
|
|
21 Feb - 5 Mar 05 - Got the wing ribs drilled, prepped, primed, and riveted.
|
|
Ribs getting primed |
|
|
|
Primed Ribs |
|
|
Nasty paints |
|
|
Piles O' ribs waiting for primer |
|
|
|
Flap bracket attached |
|
|
One side riveted, one side waiting in the wings (no pun intended) |
|
|
Working on the right wing |
|
|
Riveting the right wing rib |
|
|
|
|
Not posing and actually driving rivets |
|
|